Superphénix
Javascript is required to view this map.
![]() INES 2 |
IMPACT ON SAFETY DUE TO VIOLATION OF OPERATIONAL LIMITS AND CONDITIONS (IMPURITY DUE TO AIR INGRESS) |
Incident with infringement of technical operation specifications, resulting in a prolonged shutdown of the Superphenix reactor.
From 20 June to 3 July, following an inadvertent inflow of air into the primary circuit, the reactor operated with a sodium impurity level exceeding the limit stipulated in the technical specifications.
