INES-event
INES 2

INOPERABILITY OF NEUTRON FLUX MEASUREMENT DURING COLD SHUTDOWN

After the monthly control of the nuclear monitoring system on July 25 it was not noticed by the personnel, that the ionization chambers of the low and middle range of the monitoring system after controlling were driven out of their working range and not driven back.

This faulty position was observed 24 hours later after controlling by a shift-physicist.

During this period of 24 hrs the nuclear monitoring system for the cold shutdown stage of the reactor was not available. The shutdown concentration of boric acid in the primary circuit during this time was cB=17.1 g/l.
BASIS FOR RATING: degradation of defence in depth: C-2P 1/2
4.2.b human error and
4.2.d procedures are considered inadequate +1
rating 2
DIFFICULTIES IN RATING:

Location: GREIFSWALD-5
Event date: Thu, 05-07-1990
Nuclear event report
Legenda & explanation