INES-event
INES 1

Scram of the reactor caused by a wrong operation of the control room operator

At 14:42 (reactor on power 93%) the control room operator carried out a wrong manipulation (to set up emergency level of power) resulting in a reactor scram. The reactor was restarted on October 7, 1996 at 5:33 (100% power).
Justification of rating: According to the INES user's manual section III-5.3 (safety culture) this event was rated as level 1.

Location: DUKOVANY-4
Event date: Sun, 06-10-1996
Nuclear event report
Legenda & explanation