FUEL BUNDLE LATTICE SPACING FAILURES
Tuesday, July 2, 1991
The Loviisa fuel bundles have ten spacing latices. The on-site examinations of spent fuel have revealed deformation and relocation of the uppermost lattice. The extent and the consequences of this failure mode are being evaluated.
BASIS FOR RATING: Safety function availability: full. Real initiator: fuel bundle spacinglattice failure. Initiator frequency: Possible. Table A2 gives 1.
DIFFICULTIES IN RATING:
Location:
LOVIISA-1
Event date:
Mon, 1990-01-01 Javascript is required to view this map.